Files
Gondulf/docs/reports/2025-11-20-gap-analysis-v1.0.0.md
Phil Skentelbery 115e733604 feat(phase-4a): complete Phase 3 implementation and gap analysis
Merges Phase 4a work including:

Implementation:
- Metadata discovery endpoint (/api/.well-known/oauth-authorization-server)
- h-app microformat parser service
- Enhanced authorization endpoint with client info display
- Configuration management system
- Dependency injection framework

Documentation:
- Comprehensive gap analysis for v1.0.0 compliance
- Phase 4a clarifications on development approach
- Phase 4-5 critical components breakdown

Testing:
- Unit tests for h-app parser (308 lines, comprehensive coverage)
- Unit tests for metadata endpoint (134 lines)
- Unit tests for configuration system (18 lines)
- Integration test updates

All tests passing with high coverage. Ready for Phase 4b security hardening.
2025-11-20 17:16:11 -07:00

26 KiB

GAP ANALYSIS: v1.0.0 Roadmap vs Implementation

Date: 2025-11-20 Architect: Claude (Architect Agent) Analysis Type: Comprehensive v1.0.0 MVP Verification

Executive Summary

Status: v1.0.0 MVP is INCOMPLETE

Current Completion: Approximately 60-65% of v1.0.0 requirements

Critical Finding: I prematurely declared v1.0.0 complete. The implementation has completed Phases 1-3 successfully, but Phases 4 (Security & Hardening) and Phase 5 (Deployment & Testing) have NOT been started. Multiple P0 features are missing, and critical success criteria remain unmet.

Remaining Work: Estimated 10-15 days of development to reach v1.0.0 release readiness


Phase-by-Phase Analysis

Phase 1: Foundation (Week 1-2)

Status: COMPLETE

Required Features:

  1. Core Infrastructure (M) - COMPLETE
  2. Database Schema & Storage Layer (S) - COMPLETE
  3. In-Memory Storage (XS) - COMPLETE
  4. Email Service (S) - COMPLETE
  5. DNS Service (S) - COMPLETE

Exit Criteria Verification:

  • All foundation services have passing unit tests (96 tests pass)
  • Application starts without errors
  • Health check endpoint returns 200
  • Email can be sent successfully (tested with mocks)
  • DNS queries resolve correctly (tested with mocks)
  • Database migrations run successfully (001_initial_schema)
  • Configuration loads and validates correctly
  • Test coverage exceeds 80% (94.16%)

Gaps: None

Report: /home/phil/Projects/Gondulf/docs/reports/2025-11-20-phase-1-foundation.md


Phase 2: Domain Verification (Week 2-3)

Status: COMPLETE

Required Features:

  1. Domain Service (M) - COMPLETE
  2. Email Verification UI (S) - COMPLETE

Exit Criteria Verification:

  • Both verification methods work end-to-end (DNS TXT + email fallback)
  • TXT record verification preferred when available
  • Email fallback works when TXT record absent
  • Verification results cached in database (domains table)
  • UI forms accessible and functional (templates created)
  • Integration tests for both verification methods (98 tests, 71.57% coverage on new code)

Gaps: Endpoint integration tests not run (deferred to Phase 5)

Report: /home/phil/Projects/Gondulf/docs/reports/2025-11-20-phase-2-domain-verification.md


Phase 3: IndieAuth Protocol (Week 3-5)

Status: PARTIALLY COMPLETE ⚠️ (3 of 4 features complete)

Required Features:

  1. Authorization Endpoint (M) - COMPLETE
  2. Token Endpoint (S) - COMPLETE
  3. Metadata Endpoint (XS) - MISSING 🔴
  4. Authorization Consent UI (S) - COMPLETE

Exit Criteria Verification:

  • Authorization flow completes successfully (code implemented)
  • Tokens generated and validated (token service implemented)
  • Metadata endpoint NOT implemented 🔴
  • Client metadata NOT displayed correctly 🔴 (h-app microformat fetching NOT implemented)
  • All parameter validation working (implemented in routers)
  • Error responses compliant with OAuth 2.0 (implemented)
  • End-to-end tests NOT run 🔴

Critical Gaps:

  1. MISSING: /.well-known/oauth-authorization-server metadata endpoint 🔴

    • Requirement: v1.0.0 roadmap line 62, Phase 3 line 162, 168
    • Impact: IndieAuth clients may not discover authorization/token endpoints
    • Effort: XS (<1 day per roadmap)
    • Status: P0 feature not implemented
  2. MISSING: Client metadata fetching (h-app microformat) 🔴

    • Requirement: Success criteria line 27, Phase 3 line 169
    • Impact: Consent screen cannot display client app name/icon
    • Effort: S (1-2 days to implement microformat parser)
    • Status: P0 functional requirement not met
  3. MISSING: End-to-end integration tests 🔴

    • Requirement: Phase 3 exit criteria line 185, Testing Strategy lines 282-287
    • Impact: No verification of complete authentication flow
    • Effort: Part of Phase 5
    • Status: Critical testing gap

Report: /home/phil/Projects/Gondulf/docs/reports/2025-11-20-phase-3-token-endpoint.md


Phase 4: Security & Hardening (Week 5-6)

Status: NOT STARTED

Required Features:

  1. Security Hardening (S) - NOT STARTED
  2. Security testing - NOT STARTED

Exit Criteria (NONE MET):

  • All security tests passing 🔴
  • Security headers verified 🔴
  • HTTPS enforced in production 🔴
  • Timing attack tests pass 🔴
  • SQL injection tests pass 🔴
  • No sensitive data in logs 🔴
  • External security review recommended (optional but encouraged)

Critical Gaps:

  1. MISSING: Security headers implementation 🔴

    • No X-Frame-Options, X-Content-Type-Options, Strict-Transport-Security
    • No Content-Security-Policy
    • Requirement: Success criteria line 44, Phase 4 deliverables line 199
    • Impact: Application vulnerable to XSS, clickjacking, MITM attacks
    • Effort: S (1-2 days)
  2. MISSING: HTTPS enforcement 🔴

    • No redirect from HTTP to HTTPS
    • No validation that requests are HTTPS in production
    • Requirement: Success criteria line 44, Phase 4 deliverables line 198
    • Impact: Credentials could be transmitted in plaintext
    • Effort: Part of security hardening (included in 1-2 days)
  3. MISSING: Security test suite 🔴

    • No timing attack tests (token comparison)
    • No SQL injection tests
    • No XSS prevention tests
    • No open redirect tests
    • No CSRF protection tests
    • Requirement: Phase 4 lines 204-206, Testing Strategy lines 289-296
    • Impact: Unknown security vulnerabilities
    • Effort: S (2-3 days per roadmap line 195)
  4. MISSING: Constant-time token comparison verification 🔴

    • Implementation uses SHA-256 hash comparison (good)
    • But no explicit tests for timing attack resistance
    • Requirement: Phase 4 line 200, Success criteria line 32
    • Impact: Potential timing side-channel attacks
    • Effort: Part of security testing
  5. MISSING: Input sanitization audit 🔴

    • Requirement: Phase 4 line 201
    • Impact: Potential injection vulnerabilities
    • Effort: Part of security hardening
  6. MISSING: PII logging audit 🔴

    • Requirement: Phase 4 line 203
    • Impact: Potential privacy violations
    • Effort: Part of security hardening

Report: NONE (Phase not started)


Phase 5: Deployment & Testing (Week 6-8)

Status: NOT STARTED

Required Features:

  1. Deployment Configuration (S) - NOT STARTED
  2. Comprehensive Test Suite (L) - PARTIALLY COMPLETE (unit tests only)
  3. Documentation review and updates - NOT STARTED
  4. Integration testing with real clients - NOT STARTED

Exit Criteria (NONE MET):

  • Docker image builds successfully 🔴
  • Container runs in production-like environment 🔴
  • All tests passing (unit , integration ⚠️, e2e , security )
  • Test coverage ≥80% overall, ≥95% for critical code (87.27% but missing security tests)
  • Successfully authenticates with real IndieAuth client 🔴
  • Documentation complete and accurate 🔴
  • Release notes approved

Critical Gaps:

  1. MISSING: Dockerfile 🔴

    • No Dockerfile exists in repository
    • Requirement: Success criteria line 36, Phase 5 deliverables line 233
    • Impact: Cannot deploy to production
    • Effort: S (1-2 days per roadmap line 227)
    • Status: P0 deployment requirement
  2. MISSING: docker-compose.yml 🔴

    • Requirement: Phase 5 deliverables line 234
    • Impact: Cannot test deployment locally
    • Effort: Part of deployment configuration
  3. MISSING: Backup script for SQLite 🔴

    • Requirement: Success criteria line 37, Phase 5 deliverables line 235
    • Impact: No operational backup strategy
    • Effort: Part of deployment configuration
  4. MISSING: Environment variable documentation

    • .env.example exists but not comprehensive deployment guide
    • Requirement: Phase 5 deliverables line 236
    • Impact: Operators don't know how to configure server
    • Effort: Part of documentation review
  5. MISSING: Integration tests for endpoints 🔴

    • Only 5 integration tests exist (health endpoint only)
    • Routers have 29-48% coverage
    • Requirement: Testing Strategy lines 275-280, Phase 5 line 230
    • Impact: No verification of HTTP request/response cycle
    • Effort: M (3-5 days, part of comprehensive test suite)
  6. MISSING: End-to-end tests 🔴

    • No complete authentication flow tests
    • Requirement: Testing Strategy lines 282-287
    • Impact: No verification of full user journey
    • Effort: Part of comprehensive test suite
  7. MISSING: Real client testing 🔴

    • Not tested with any real IndieAuth client
    • Requirement: Success criteria line 252, Phase 5 lines 239, 330
    • Impact: Unknown interoperability issues
    • Effort: M (2-3 days per roadmap line 231)
  8. MISSING: Documentation review

    • Architecture docs may be outdated
    • No installation guide
    • No configuration guide
    • No deployment guide
    • No troubleshooting guide
    • Requirement: Phase 5 lines 229, 253, Release Checklist lines 443-451
    • Effort: M (2-3 days per roadmap line 229)
  9. MISSING: Release notes

    • Requirement: Phase 5 deliverables line 240
    • Impact: Users don't know what's included in v1.0.0
    • Effort: S (<1 day)

Report: NONE (Phase not started)


Feature Scope Compliance

Comparing implementation against P0 features from v1.0.0 roadmap (lines 48-68):

Feature Priority Status Evidence Gap?
Core Infrastructure P0 COMPLETE FastAPI app, config, logging No
Database Schema & Storage Layer P0 COMPLETE SQLAlchemy, 3 migrations No
In-Memory Storage P0 COMPLETE CodeStore with TTL No
Email Service P0 COMPLETE SMTP with TLS support No
DNS Service P0 COMPLETE dnspython, TXT verification No
Domain Service P0 COMPLETE Two-factor verification No
Authorization Endpoint P0 COMPLETE /authorize router No
Token Endpoint P0 COMPLETE /token router No
Metadata Endpoint P0 MISSING No /.well-known/oauth-authorization-server YES 🔴
Email Verification UI P0 COMPLETE verify_email.html template No
Authorization Consent UI P0 COMPLETE authorize.html template No
Security Hardening P0 NOT STARTED No security headers, HTTPS enforcement, or tests YES 🔴
Deployment Configuration P0 NOT STARTED No Dockerfile, docker-compose, or backup script YES 🔴
Comprehensive Test Suite P0 ⚠️ PARTIAL 226 unit tests (87.27%), no integration/e2e/security YES 🔴

P0 Features Complete: 11 of 14 (79%) P0 Features Missing: 3 (21%)


Success Criteria Assessment

Functional Success Criteria (Line 22-28)

Criterion Status Evidence Gap?
Complete IndieAuth authentication flow ⚠️ PARTIAL Authorization + token endpoints exist Integration not tested
Email-based domain ownership verification COMPLETE Email service + verification flow No
DNS TXT record verification (preferred) COMPLETE DNS service working No
Secure token generation and storage COMPLETE secrets.token_urlsafe + SHA-256 No
Client metadata fetching (h-app microformat) MISSING No microformat parser implemented YES 🔴

Functional Completion: 4 of 5 (80%)

Quality Success Criteria (Line 30-34)

Criterion Status Evidence Gap?
80%+ overall test coverage COMPLETE 87.27% coverage No
95%+ coverage for authentication/token/security code ⚠️ PARTIAL Token: 91.78%, Auth: 29.09% Integration tests missing
All security best practices implemented NOT MET Phase 4 not started YES 🔴
Comprehensive documentation ⚠️ PARTIAL Architecture docs exist, deployment docs missing YES 🔴

Quality Completion: 1 of 4 (25%)

Operational Success Criteria (Line 36-40)

Criterion Status Evidence Gap?
Docker deployment ready NOT MET No Dockerfile exists YES 🔴
Simple SQLite backup strategy NOT MET No backup script YES 🔴
Health check endpoint COMPLETE /health endpoint working No
Structured logging COMPLETE logging_config.py implemented No

Operational Completion: 2 of 4 (50%)

Compliance Success Criteria (Line 42-44)

Criterion Status Evidence Gap?
W3C IndieAuth specification compliance ⚠️ UNCLEAR Core endpoints exist, not tested with real clients YES 🔴
OAuth 2.0 error responses COMPLETE Token endpoint has compliant errors No
Security headers and HTTPS enforcement NOT MET Phase 4 not started YES 🔴

Compliance Completion: 1 of 3 (33%)


Overall Success Criteria Summary

  • Functional: 4/5 (80%) ⚠️
  • Quality: 1/4 (25%)
  • Operational: 2/4 (50%)
  • Compliance: 1/3 (33%)

Total Success Criteria Met: 8 of 16 (50%)


Critical Gaps (Blocking v1.0.0 Release)

1. MISSING: Metadata Endpoint (P0 Feature)

  • Priority: CRITICAL 🔴
  • Requirement: v1.0.0 roadmap line 62, Phase 3
  • Impact: IndieAuth clients cannot discover endpoints programmatically
  • Effort: XS (<1 day)
  • Specification: W3C IndieAuth requires metadata endpoint for discovery

2. MISSING: Client Metadata Fetching (h-app microformat) (P0 Functional)

  • Priority: CRITICAL 🔴
  • Requirement: Success criteria line 27, Phase 3 deliverables line 169
  • Impact: Users cannot see what app they're authorizing (poor UX)
  • Effort: S (1-2 days to implement microformat parser)
  • Specification: IndieAuth best practice for client identification

3. MISSING: Security Hardening (P0 Feature)

  • Priority: CRITICAL 🔴
  • Requirement: v1.0.0 roadmap line 65, entire Phase 4
  • Impact: Application not production-ready, vulnerable to attacks
  • Effort: S (1-2 days for implementation)
  • Components:
    • Security headers (X-Frame-Options, CSP, HSTS, etc.)
    • HTTPS enforcement in production mode
    • Input sanitization audit
    • PII logging audit

4. MISSING: Security Test Suite (P0 Feature)

  • Priority: CRITICAL 🔴
  • Requirement: Phase 4 lines 195-196, 204-217
  • Impact: Unknown security vulnerabilities
  • Effort: S (2-3 days)
  • Components:
    • Timing attack tests
    • SQL injection tests
    • XSS prevention tests
    • Open redirect tests
    • CSRF protection tests (state parameter)

5. MISSING: Deployment Configuration (P0 Feature)

  • Priority: CRITICAL 🔴
  • Requirement: v1.0.0 roadmap line 66, Phase 5
  • Impact: Cannot deploy to production
  • Effort: S (1-2 days)
  • Components:
    • Dockerfile with multi-stage build
    • docker-compose.yml for testing
    • Backup script for SQLite
    • Environment variable documentation

6. MISSING: Integration & E2E Test Suite (P0 Feature)

  • Priority: CRITICAL 🔴
  • Requirement: v1.0.0 roadmap line 67, Testing Strategy, Phase 5
  • Impact: No verification of complete authentication flow
  • Effort: L (part of 10-14 day comprehensive test suite effort)
  • Components:
    • Integration tests for all endpoints (authorization, token, verification)
    • End-to-end authentication flow tests
    • OAuth 2.0 error response tests
    • W3C IndieAuth compliance tests

7. MISSING: Real Client Testing (P0 Exit Criteria)

  • Priority: CRITICAL 🔴
  • Requirement: Phase 5 exit criteria line 252, Success metrics line 535
  • Impact: Unknown interoperability issues with real IndieAuth clients
  • Effort: M (2-3 days)
  • Requirement: Test with ≥2 different IndieAuth clients

8. MISSING: Deployment Documentation (P0 Quality)

  • Priority: HIGH 🔴
  • Requirement: Phase 5, Release Checklist lines 443-451
  • Impact: Operators cannot deploy or configure server
  • Effort: M (2-3 days)
  • Components:
    • Installation guide (tested)
    • Configuration guide (complete)
    • Deployment guide (tested)
    • Troubleshooting guide
    • API documentation (OpenAPI)

Important Gaps (Should Address)

9. LOW: Authorization Endpoint Integration Tests

  • Priority: IMPORTANT ⚠️
  • Impact: Authorization endpoint has only 29.09% test coverage
  • Effort: Part of integration test suite (included in critical gap #6)
  • Note: Core logic tested via unit tests, but HTTP layer not verified

10. LOW: Verification Endpoint Integration Tests

  • Priority: IMPORTANT ⚠️
  • Impact: Verification endpoint has only 48.15% test coverage
  • Effort: Part of integration test suite (included in critical gap #6)
  • Note: Core logic tested via unit tests, but HTTP layer not verified

Minor Gaps (Nice to Have)

11. MINOR: External Security Review

  • Priority: OPTIONAL
  • Requirement: Phase 4 exit criteria line 218 (optional but encouraged)
  • Impact: Additional security assurance
  • Effort: External dependency, not blocking v1.0.0

12. MINOR: Performance Baseline

  • Priority: OPTIONAL
  • Requirement: Phase 5 pre-release line 332
  • Impact: No performance metrics for future comparison
  • Effort: XS (part of deployment testing)

Effort Estimation for Remaining Work

Gap Priority Effort Dependencies
#1: Metadata Endpoint CRITICAL XS (<1 day) None
#2: Client Metadata (h-app) CRITICAL S (1-2 days) None
#3: Security Hardening CRITICAL S (1-2 days) None
#4: Security Test Suite CRITICAL S (2-3 days) #3
#5: Deployment Config CRITICAL S (1-2 days) None
#6: Integration & E2E Tests CRITICAL M (3-5 days) #1, #2
#7: Real Client Testing CRITICAL M (2-3 days) #1, #2, #5
#8: Deployment Documentation HIGH M (2-3 days) #5, #7

Total Estimated Effort: 13-21 days

Realistic Estimate: 15-18 days (accounting for integration issues, debugging)

Conservative Estimate: 10-15 days if parallelizing independent tasks


Recommendation

Current Status

v1.0.0 MVP is NOT complete.

The implementation has made excellent progress on Phases 1-3 (foundation, domain verification, and core IndieAuth endpoints), achieving 87.27% test coverage and demonstrating high code quality. However, critical security hardening, deployment preparation, and comprehensive testing have not been started.

Completion Assessment

Estimated Completion: 60-65% of v1.0.0 requirements

Phase Breakdown:

  • Phase 1 (Foundation): 100% complete
  • Phase 2 (Domain Verification): 100% complete
  • Phase 3 (IndieAuth Protocol): 75% complete (metadata endpoint + client metadata missing)
  • Phase 4 (Security & Hardening): 0% complete
  • Phase 5 (Deployment & Testing): 10% complete (unit tests only)

Feature Breakdown:

  • P0 Features: 11 of 14 complete (79%)
  • Success Criteria: 8 of 16 met (50%)

Remaining Work

Minimum Remaining Effort: 10-15 days

Critical Path:

  1. Implement metadata endpoint (1 day)
  2. Implement h-app client metadata fetching (1-2 days)
  3. Security hardening implementation (1-2 days)
  4. Security test suite (2-3 days)
  5. Deployment configuration (1-2 days)
  6. Integration & E2E tests (3-5 days, can overlap with #7)
  7. Real client testing (2-3 days)
  8. Documentation review and updates (2-3 days)

Can be parallelized:

  • Security hardening + deployment config (both infrastructure tasks)
  • Real client testing can start after metadata endpoint + client metadata complete
  • Documentation can be written concurrently with testing

Next Steps

Immediate Priority (Next Sprint):

  1. Implement metadata endpoint (1 day) - Unblocks client discovery
  2. Implement h-app microformat parsing (1-2 days) - Unblocks consent UX
  3. Implement security hardening (1-2 days) - Critical for production readiness
  4. Create Dockerfile + docker-compose (1-2 days) - Unblocks deployment testing

Following Sprint: 5. Security test suite (2-3 days) - Verify hardening effectiveness 6. Integration & E2E tests (3-5 days) - Verify complete flows 7. Real client testing (2-3 days) - Verify interoperability

Final Sprint: 8. Documentation review and completion (2-3 days) - Deployment guides 9. Release preparation (1 day) - Release notes, final testing 10. External security review (optional) - Additional assurance

Release Recommendation

DO NOT release v1.0.0 until:

  • All 8 critical gaps are addressed
  • All P0 features are implemented
  • Security test suite passes
  • Successfully tested with ≥2 real IndieAuth clients
  • Deployment documentation complete and tested

Target Release Date: +3-4 weeks from 2025-11-20 (assuming 1 developer, ~5 days/week)


Architect's Accountability

What I Missed

I take full responsibility for prematurely declaring v1.0.0 complete. My failures include:

  1. Incomplete Phase Review: I approved "Phase 3 Token Endpoint" without verifying that ALL Phase 3 requirements were met. The metadata endpoint was explicitly listed in the v1.0.0 roadmap (line 62) and Phase 3 requirements (line 162), but I did not catch its absence.

  2. Ignored Subsequent Phases: I declared v1.0.0 complete after Phase 3 without verifying that Phases 4 and 5 had been started. The roadmap clearly defines 5 phases, and I should have required completion of all phases before declaring MVP complete.

  3. Insufficient Exit Criteria Checking: I did not systematically verify each exit criterion from the v1.0.0 roadmap. If I had checked the release checklist (lines 414-470), I would have immediately identified multiple unmet requirements.

  4. Success Criteria Oversight: I did not verify that functional, quality, operational, and compliance success criteria (lines 20-44) were met before approval. Only 8 of 16 criteria are currently satisfied.

  5. Feature Table Neglect: I did not cross-reference implementation against the P0 feature table (lines 48-68). This would have immediately revealed 3 missing P0 features.

Why This Happened

Root Cause: I focused on incremental phase completion without maintaining awareness of the complete v1.0.0 scope. Each phase report was thorough and well-executed, which created a false sense of overall completeness.

Contributing Factors:

  1. Developer reports were impressive (high test coverage, clean implementation), which biased me toward approval
  2. I lost sight of the forest (v1.0.0 as a whole) while examining trees (individual phases)
  3. I did not re-read the v1.0.0 roadmap before declaring completion
  4. I did not maintain a checklist of remaining work

Corrective Actions

Immediate:

  1. This gap analysis document now serves as the authoritative v1.0.0 status
  2. Will not declare v1.0.0 complete until ALL gaps addressed
  3. Will maintain a tracking document for remaining work

Process Improvements:

  1. Release Checklist Requirement: Before declaring any version complete, I will systematically verify EVERY item in the release checklist
  2. Feature Table Verification: I will create a tracking document that maps each P0 feature to its implementation status
  3. Exit Criteria Gate: Each phase must meet ALL exit criteria before proceeding to next phase
  4. Success Criteria Dashboard: I will maintain a living document tracking all success criteria (functional, quality, operational, compliance)
  5. Regular Scope Review: Weekly review of complete roadmap to maintain big-picture awareness

Lessons Learned

  1. Incremental progress ≠ completeness: Excellent execution of Phases 1-3 does not mean v1.0.0 is complete
  2. Test coverage is not a proxy for readiness: 87.27% coverage is great, but meaningless without security tests, integration tests, and real client testing
  3. Specifications are binding contracts: The v1.0.0 roadmap lists 14 P0 features and 16 success criteria. ALL must be met.
  4. Guard against approval bias: Impressive work on completed phases should not lower standards for incomplete work

Apology

I apologize for declaring v1.0.0 complete prematurely. This was a significant oversight that could have led to premature release of an incomplete, potentially insecure system. I failed to uphold my responsibility as Architect to maintain quality gates and comprehensive oversight.

Going forward, I commit to systematic verification of ALL requirements before any release declaration.


Conclusion

The Gondulf IndieAuth Server has made substantial progress:

  • Strong foundation (Phases 1-2 complete)
  • Core authentication flow implemented (Phase 3 mostly complete)
  • Excellent code quality (87.27% test coverage, clean architecture)
  • Solid development practices (comprehensive reports, ADRs, design docs)

However, critical work remains:

  • Security hardening not started (Phase 4)
  • Deployment not prepared (Phase 5)
  • Real-world testing not performed
  • Key features missing (metadata endpoint, client metadata)

v1.0.0 is approximately 60-65% complete and requires an estimated 10-15 additional days of focused development to reach production readiness.

I recommend continuing with the original 5-phase plan, completing Phases 4 and 5, and performing comprehensive testing before declaring v1.0.0 complete.


Gap Analysis Complete

Prepared by: Claude (Architect Agent) Date: 2025-11-20 Status: v1.0.0 NOT COMPLETE - Significant work remaining Estimated Remaining Effort: 10-15 days Target Release: +3-4 weeks